SR Francis flame and water drop logoS R FrancisPLUMBING & HEATINGmaintaining the flow of H₂OCIPHE Member
Which? Trusted TraderTrustATrader
Bathroom installations

Complete Bathroom Refurbishments

We take it back to brick and see it through to the final sealant.

A complete refurbishment

One planned sequence, not a collection of separate jobs

Where possible, the room is stripped back and rebuilt properly. Plumbing, floors, boxing, shower walls and niches are planned before plastering, electrics, tiling and the final second fix.

Only got one bathroom?

We plan the job around keeping disruption to a minimum

When it is the only bathroom in the house, the job needs careful sequencing. We commit the time to keep the work moving with no unnecessary gaps, and restore essential facilities as quickly as the stage of the job allows. With two bathrooms there is naturally less pressure; with one, planning the order of the work properly really matters.

What a full refurbishment involves

Stripped back and rebuilt properly

A full refurbishment will often mean taking the room back to brick, removing the old suite and tiles, renewing flooring where required and replumbing or repositioning services for the new layout. That can include concealed showers and ceiling-fed shower heads, new boxing, niches and shower walls, followed by plasterboarding, plastering, ceiling decoration, tiling and second-fix installation. We can also coordinate items such as the extractor fan, new lighting, flooring and the final specialist sealant work.

Choosing your bathroom

You choose the things you can see

You buy the visible products you want in your bathroom — such as the suite, bath, basin, shower tray, shower valves, tiles, grout, adhesive and flooring. Steve can advise on what will work with the room and, where available, help you access supplier or trade discounts. SR Francis supplies the labour and installation materials, while you retain the paperwork and warranties for the products you have chosen.

How the job comes together

From strip-out to finished bathroom

1 · STRIP OUT & PREPARE
Strip out

The old bathroom is stripped out and the room is prepared for the new layout.

2 · PLUMBING & FIRST FIX
First fix

First-fix plumbing is installed and the walls are prepared before the finish goes on.

3 · TILING
Tiling

The room is fully tiled and ready for the sanitary ware and final fittings.

4 · FINISHED BATHROOM
Finished bathroom view one

Completed bathroom — finished view one.

5 · FINISHED BATHROOM
Finished bathroom view two

Completed bathroom — finished view two.

View Our Bathroom Gallery →

Planning a new bathroom?

Send a photo or short video on WhatsApp for a free, no-obligation chat.

SR Francis Plumbing and HeatingBusiness operating address (no walk-in premises): 19 Holmcroft Way, Bromley BR2 8ADCall 07794 814961 · WhatsApp Steve